You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Tanggul di Kembangan Rampung
.
photo Wuri Setyaningsih - Beritajakarta.id

Repair of Kali Angke River Embankment in Kembangan Selatan Completed

The Kembangan Sub-district Water Resources (SDA) Executing Unit, West Jakarta has completed repairing the damaged embankment of the Kali Angke River, Jalan H Jafar, RT 06/01, Kembangan Selatan Urban Village.

Alhamdulillah, today, the repair is finished already

Mulyadi, Executing Unit Head of Kembangan Sub-district SDA said the repair started on February 8 was conducted to follow up on resident reports. The damage was because of landslides after being hit by the flow of river water.

"To conduct it, we have sent 20 personnel to the location. Alhamdulillah, today, the repair is finished already," he expressed, Thursday (3/4).

Damaged Barrier for Embankment on Pramuka Island Repaired Completely

He added the length of the repaired embankment was 23 meters, with 410 centimeters width and 270 centimeters height.

"Hopefully the same incident can be anticipated in the future," he hoped.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye546 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye441 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye300 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye295 personTiyo Surya Sakti